Your VDC Coordinator is the Conductor in your BIM Orchestra


Who on your construction team will know everything about your building? Your Superintendent, and likely your Virtual Design and Construction (VDC) Coordinator who will be responsible for the Building Information Model (BIM).
The VDC Coordinator is the individual that will know the most about the building, especially early on in the project. The VDC Coordinator will know about each trade’s modeled content, which Addendum or RFI will impact a specific area, and if the overall design can be built as provided by the design team. The coordinator will also request new models from the design team, ask a trade to shift a duct in a coordination meeting, or find a better way to route conduit through a tight path.
In short, the VDC Coordinator is the conductor in your BIM orchestra. The orchestra is the owner, design team, contractors, and subs.
On a project that I was personally involved with earlier in my VDC Coordinator career, the construction project manager and I were walking through a large building and I noted a substantial gas line in an interstitial space. The project manager stopped in his tracks when I commented that it was a surprise to see it, and it wasn’t in the BIM. His response was, “You are right. It is a temporary gas line, and you need to get away from your computer more often.” I had become an extension of the building in since I knew most everything about the project.
The VDC Coordinator will constantly be asked for information, generate troves of data, research issues, expedite/generate RFI’s, and find creative ways to solve problems for the field. This may be by utilizing the BIM for additional modeling of one-off items, coordination, clash detection, drafting, animations, renderings, 4D (animation over time), and/or 5D (model with cost data). It could also be by integrating a point cloud to confirm existing conditions against the model or utilizing Unmanned Aircraft System (UAS) data for civil overlay content to supplement the BIM. The VDC Coordinator will be that orchestral conductor, ensuring that all of these items are integrated in a format that will maintain project integrity. The conductor maintains technology and access credentials, coordinates subcontractor files encompassing the overall BIM, and ensures meeting minutes are distributed in a timely manner.